First steam test

We decided it would not be practical or sensible to relaunch Consuta this year but instead would carry out steam tests of the new boiler installation while Consuta was still on it's trailer.

The date for this test was chosen for Saturday 25th Sept.

Consuta had to be pulled out of the shed - just enough to have the boiler outside. The purpose of the test was to check that all the new boiler auxiliaries would work properly, especially the workings of the two injectors which keep the boiler filled when steaming.

Above:- waiting for the boiler to come into steam - tea break?.










Note that the safety valve is starting to wisp while the reading on the pressure gauge is only showing about 160 psi, the working pressure is supposed to be 180 psi?? A discrepancy which needs sorting out.

When we blew the boiler down, the breeze blew the steam into the shed, and we could hardly see the other end of the long shed.