The photo above left shows the wider removable side deck sections which have to be removed when lifting the boiler.
Photo on the right shows the route of the engine steam and exhaust pipes. Currently the steam pipe is being made up in screwed steel pipe sections, but once the layout is OK it will then be made up in 1.5 inch ID copper pipe.

An interesting question is should there be provision for accomodating length changes in this pipe caused by heat expansion, perhaps not needed as it's fairly short?